WORCA Climbtrac System
A hydraulic vertical track based system. It enables the entire core/wall formwork to be elevated to the next pour height/floor level in one unit without the need of a crane. Work decks are built into the system to allow safe and efficient working access to the core/wall formwork.







Main Components
Supplied by WORCA
- Walls formwork
- Main platform
- Working platform (-1)
- Working platform (-2)
- Tilting and tying items
- Protection screen
- Hydraulic mechanism
Applications
- Multiple casts walls in high-rise buildings
- Main core walls in skyscrapers
- Large section piers in bridges
- Pylons
- External perimeter walls
Technical Data
- Inclined structures: up to 15°
- Allows platforms to be lifted together with wall forms, whilst remaining captive on the concrete structure during climbing operations.
- Flexible system with a carriage separated from the triangular frame allowing to reduce the number frames and cast difficult geometries.
- Platforms are up to 12m length with the ability to carry multiple panels [with separate multiple carriages].
- Tailor-made solutions can be provided for shafts & narrow areas.
- Cones & removal tools are made of chrome.
Special Features
- Retraction mechanism overcomes backlash.
- Retracting carriage is separated from the A-Frame.
- The system is fully braced in order to improve system rigidity.
- Protection screen provides high-level of safety & wind resistance.
Site Requirements
Supplied by Contractor

Timber Beams

Nails

Skilled Carpenter