WORCA Crane Climbing System
A versatile solution ideally suited to the construction of high-rise buildings, including lift shafts, stairwells, and perimeter facade walls. Furthermore, its application extends to large-section piers in bridge construction and provides a suitable platform for both formwork operations and concrete curing processes.




Main Components
Supplied by WORCA
- WCC brackets & accessories
- Finishing platform
- Strong-back & carriage
- Anchorage system
- Bracing (tubes)
- H20 girders / WORCA beam S12
- Upper scaffolding (for Rft. works)
Applications
- Lift shafts, cores & stairwells
- Perimeter or facade walls
- Silos, Tanks (elevated), chimneys & shafts of elevated tanks
- Large section piers in bridges
- Pylons
Features
- Formwork panel & platform can be lifted as one unit to accelerate the work, reduce labor & crane costs and save working area.
- ACCS 240 is retractable which permits 60cm to allow cleaning of formwork Rft. works and fixation of anchor.
- WCCS 160 is fixed with adapter unit to be able to tilt the shutter to move it to the next stage.
- Compatible with H20 and soldiers system, Tech Form, Eco Form, Big Steel Panels or other formwork systems as well.
- Highly resistant to wind load.
- Suitable for straight and curved walls.
- Has 3 access levels.
- Lower access platform C/W access ladder.
- Provide adequate workspace and access.
Compatibility
- H20 & soldier system
- WORCA beam S12 & soldier
- Tech-form panels
- Eco-form panels
- Big steel panels


Compatibility
- H20 & soldier system
- WORCA beam S12 & soldier
- Tech-form panels
- Eco-form panels
- Big steel panels
Site Requirements
Supplied by Contractor

Timber Beams

Crane

Nails

Skilled Carpenter