Stands out as a versatile and efficient solution for constructing concrete columns, particularly when the project demands a rapid and repetitive pouring schedule. This mid-duty panel system can adapt to various jobsite constraints. For larger pours or when available, ECO-FORM panels can be efficiently maneuvered into place using a crane. However, the system is also modular and lightweight enough to be hand-assembled, making it suitable for situations with limited space or tight access. Regardless of the assembly method, ECO-FORM comes pre-equipped with WORCA board premium sheets. These reusable sheets not only contribute to the system’s overall cost-effectiveness, but also boast exceptional durability and the ability to deliver a smooth, high-quality concrete finish.






Supplied by WORCA
- Panels C/W. WORCA board
- Connecting Parts (Couplers & Compensation walers)
- Tie rods
- Tilting Items
- Access brackets
- Rectangular columns
- L-shape columns
- Hollow columns
- T-shape columns
- Piers
- Posts
- Permissible fresh concrete pressure: 60 kN/m2
- Clamp range: Coupler, conti-lock [Filler 0 - 100 mm] & Compensation waler [Filler 100 - 300 mm]
- Assembly: With crane assistance or man handling. Panels are aligned, connected together ensuring tight and flush connections using Eco couplers & Conti-lock
- Concrete finishing: Fair-faced concrete quality finishing is obtained by using premium WORCA board
- Painting: Superb powder coating allows easy and fast cleaning


- Flexible tie rods positions
- WORCA board
Supplied by Contractor